Customer Checklist

Field Measure Checklist

1. Existing Countertops must be cleared off prior to field measure. Existing countertops do not need to be removed for the field measure. If you wish to have AHE Granite, Inc. remove the existing countertops, please specify prior to the day of installation and the incurred costs will be added to your contract.

2. All sinks, faucets & cooktops must be on site for the field measure. All sink & faucet hole locations are to be confirmed at the time of the field measure.

3. Edge details, including laminated edges, are to be confirmed at the time of measure.

Install Checklist

1. All existing sinks and faucets must be disconnected prior to installation. AHE Granite, Inc. installs the undermount sinks. All of the other plumbing will be the responsibility of the homeowner or contractor.

2. Existing countertops must be removed prior to the date of installation, if AHE Granite, Inc. is not removing them. If AHE Granite, Inc. is removing the existing countertops, plumbing must be disconnected and countertops must be cleared off, prior to arrival.

Select Your Sink

AHE Granite offers several standard sink options. If you are looking for something different or would like a custom sink built, just let us know - we can accommodate almost any request.

Omni 50/50 Sink
View Details

Omni 60/40 Sink
View Details

Quartz Composite Sinks
View Details

Milford Rectangular Lavatory Sink
View Details

Ashton Oval Lavatory Sink
View Details

Our Stone Comes from The Best